Grid

The wind farm operates an internal grid of 33 kV.

Alcoa havn - Nordlys Vind

At Tverråsan, between the two wind farms, the power is exported to the regional 132 kV grid operated by Troms Kraft Nett AS.

Two new substations and one switching station will be installed for the grid connection of the wind farms.

Power lines and substations north and south of Håkoybøtn will be strenghtened to accommodate the full capacity of the wind farms.

The power is sold to the aluminium producer Alcoa Norway AS, in Mosjøen.